英文简历是使用英文写的简历。英文简历(resume)并无固定不变的单一形式,应聘者完全可以根据个人的具体情况来确定采用何种形式,灵活设计。
Resume
Name: Graduates Employment Network
Gender: Female
Date of birth: 1972-02-16
Mouth: Jiangsu
The current city: Shanghai City
Work experience: five years
The current annual salary: 5-6 million yuan
Mobile phone:
Residential address:
Self evaluation
5 years working experience in mechanical design, by CET-6. Pro-E, familiar with AutoCAD, Solidworks and Office, familiar with the process, can be engaged in the design and development and project management.
Job intention
Target industry: Machinery / equipment / instrument / heavy industry, industrial automation, automobile and spare parts, petroleum / chemical / mineral / Geology
Target position: Mechanical Engineer
Expectations: Shanghai City
Expected salary: salary welfare needs to fill, generally relatively safe negotiable
Time: how long can the arrival of new jobs
Work experience
20xx/07 XXX now
Industry: Machinery / equipment / heavy industry
Department of Mechanical Design Engineer
Main responsibilities
1 by the individuals responsible for project, master project schedule, assist business personnel to understand customer needs, design fixture, fixture, equipment modification and field surveying and mapping parts, including assembly drawing, part drawing, BOM list, assist purchasing staff.
2 by the individuals responsible for project, master project schedule.
3 customers are Shanghai GM, Shanghai Volkswagen, Shanghai Natiefu, Wuxi BOSCH, Wuhu United States, Kunshan and Hangzhou etc. universal Fuji.
20xx/06 20xx/06: Shanghai Keepahead ultrasonic equipment Co., Ltd.
Industry: Machinery / equipment / heavy industry
Department of Mechanical Design Engineer
Main responsibilities:
1 responsible for the project, including equipment assembly and parts production drawings, outsourcing list, pipeline map, assist the purchasing staff to support business personnel, at the same time tracking solution occurs processing manufacturing and assembly debugging problems, and through customer acceptance, and write instructions, sometimes also translated the equipment specifications (export in the English translation).
2 the design of automatic ultrasonic cleaning equipment automatic mechanical arm, through the tunnel drying equipment, automatic high pressure spray, ultrasonic cleaning, wind drying (with the netbelt) and other non-standard equipment.
1998/10 20xx/12: Suzhou hongly mould machinery Co. ltd.;
Industry: Machinery / equipment / heavy industry
Technical department technician
Main responsibilities:
The preparation process, and according to the 2D drawings of Singapore engineer design, using Cimtron three-dimensional modeling, and translation of faxes and E-mail. Our products are stainless steel mould of glass.
Project experience
20xx/06 20xx/07: body machining fixture
Development tools: Pro-e, AutoCAD
Project Description: the fixture fixture for machining workpiece machining center, to the workpiece through the lateral expansion clamping device and the fixing plate, cutting through the spring pin to locate the center hole, take through the length of axis elliptical groove turntable mechanism to realize workpiece.
Responsibility description: responsible for the design of parts and assembly plans, production schedule, follow up the progress, solve the problems in the process of production and assembly.
20xx/12 20xx/01: a hole position check out
Development tools: Pro-e, AutoCAD
Project Description: the detector used for detecting the position degree of casting hole, products will be placed on the bottom position through a pin to detect the position of the workpiece, the detection position of the other inclined hole made reference plate and pin assembly of the handheld, seized by CMM, if not in the tolerance range of customer requirements in (+ 0.03), need to adjust.
Responsibility description: Design of parts and assembly plans, production schedule, track progress, solve problems, adjust the fixture to meet customer requirements in the tolerance range.
20xx/04 - 20xx/06: automatic high-pressure spray, ultrasonic cleaning, wind drying equipment production line
Development tools: AutoCAD
Project Description: this production line is used for cleaning and drying of stamping aluminum, steel mesh belt through the motor drive transmission of the workpiece, the first workpiece feeding section, the first and the two or three position is medium pressure spray, fourth, five or six position is the high-pressure spray, through high pressure pump and high pressure spray system, air knife with seventh air compressor station the water cut is eighth station, tunnel oven, final workpiece material.
Responsibilities: assist business personnel to understand customer needs, design and manufacture of the assembly and parts diagram, communication and electrical engineers, support the procurement staff, tracking the progress of solving the production problem, initial customer acceptance records of customer comments, until final acceptance by the customer.
Education and training
1994/09 1998/06: of Wuhan University of science and technology of metallurgical mechanical design and manufacturing automation degree
Certificate
1998/06 master's degree certificate
1996/09 passed the university English six levels
Language ability: English: good